My first build along TAKE DOWN RECURVE

Started by NRudder, April 27, 2011, 01:31:00 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

NRudder

So here I go on my fist build along


1)  Here are the brackets for my press I made myself

All welded and drilled

 


   


 
Rudz

NRudder

2) I put the brackets aside and worked on my heat box

Here is my heat box first

 


I then put some weather stripping where the lid sits

   


I then cocked the inside with some white cocking


 


The I started to install electrical

First I installed two gang boxes

 


http://s1195.photobucket.com/albums/aa396/NRootski/?action=view¤t=Copy2ofP1110055.jpg
Rudz

NRudder

Then I started wiring fro one to another

 


 


Then I installed a plug end on my power cord that lead out of my heat box


 


Then I attached that cord ran the cord out of the box


Here is my finished wiring job


 


Next I started to line my box with aluminum foil and tape


 


That all I got for now hope you like it any suggestion and tip would me very helpful. Tomorrow ill add some pics of my riser and finished heat box
Rudz

NRudder

do my photos show up ??? if not how do i get the to go on? im using photo bucket and its not working
Rudz

matts2

I don't see them.  You should be using the [img] links?
Matt

fujimo


AKmud

using photobucket, copy the "direct link" code then place it in the popup box here under the img tab.

NRudder

I started a new one with pics check er out thanks for the incight